Wednesday, February 5, 2025

Demovsky’s behind schedule shot raises De Pere on Ashwabenon, 70-68

Ashwaubenon (NBC 26) – After falling to De Pere, two points at the beginning of this season Ashwabenon was looking for a redemption on his court.

But Redbirds jumped to early lead and had an advantage of 35–29 during the break.

- Advertisement -

Wisconsin Commit Zach Kinziger found its rhythm in the second half, helping De Pere extend double figurines. There are three minutes, Redbirds led by 12 as songs “I believe that we will win” from the student section De Pere.

De Pere released the pace, passing the ball to run down the watch. But the game was far from the end.

Ashwaubenon was forced to foul, and after a few unsuccessful free throws by De Pere Jaguars, they installed a furious return. 3-point points and one basket reduce the deficit to single possession.

Then Alabama Commit Amari Allen took over while shooting a basket.

After time, De Pere had his last chance. Isaac Herlache found Roan Demovsky inside, and Demovsky hit a shot.

Ashwaubenon remained 1.6 seconds to answer. Jaguars made an art that established a semi-child wave from Allen, but the shot missed.

De Pere defeated Ashwabenon in a thriller, 70-68.

Points leaders for De Pere:

Zach Kinziger – 22 points

Roan Demovsky – 19 points

Gregoire Pryce – 13 points

Leaders of points for AshWaubenon:

Amari Allen – 30 points

Elijah Fenner – 19 points

Carson Dorgu – 10 points

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Hot Topics

vertshock.com

Related Articles